Last updated: 2019-03-20

workflowr checks: (Click a bullet for more information)
  • R Markdown file: up-to-date

    Great! Since the R Markdown file has been committed to the Git repository, you know the exact version of the code that produced these results.

  • Repository version: 9f45ef7

    Great! You are using Git for version control. Tracking code development and connecting the code version to the results is critical for reproducibility. The version displayed above was the version of the Git repository at the time these results were generated.

    Note that you need to be careful to ensure that all relevant files for the analysis have been committed to Git prior to generating the results (you can use wflow_publish or wflow_git_commit). workflowr only checks the R Markdown file, but you know if there are other scripts or data files that it depends on. Below is the status of the Git repository when the results were generated:
    
    Ignored files:
        Ignored:    .Rhistory
        Ignored:    .Rproj.user/
        Ignored:    data/sst_ALL_add_trend.Rdata
        Ignored:    data/sst_ALL_clim_event_cat.Rdata
        Ignored:    data/sst_ALL_clim_only.Rdata
        Ignored:    data/sst_ALL_flat.Rdata
        Ignored:    data/sst_ALL_knockout.Rdata
        Ignored:    data/sst_ALL_repl.Rdata
    
    Unstaged changes:
        Modified:   code/figures.R
        Modified:   code/workflow.R
    
    
    Note that any generated files, e.g. HTML, png, CSS, etc., are not included in this status report because it is ok for generated content to have uncommitted changes.
Expand here to see past versions:
    File Version Author Date Message
    Rmd 9f45ef7 robwschlegel 2019-03-20 Update
    html 81a2ed5 robwschlegel 2019-03-19 Build site.
    Rmd 62fe75f robwschlegel 2019-03-19 Publish the news file
    html 36100c0 robwschlegel 2019-03-19 Build site.
    Rmd 0aac666 robwschlegel 2019-03-19 Publish the menu files


2019-03-20

  • Working on the consolidated workflow script

2019-03-19

  • Switching from pkgdown to workflowr for project management/visualisation

2019-03-12

  • Incorporated first round of edits from AJH
  • Began writing new decadal detection chunk

2019-03-07

  • Incorporated first round of edits from AJS

2019-03-06

  • Worked out basic event count results for all vignettes
  • Final skeleton of paper

2019-03-05

  • More missing data work
  • Worked through basic decadal trend results

2019-03-04

  • Working through the missing data analyses

2019-02-26

  • Working through the duration analyses

2019-02-25

  • More work on the skeleton
  • Beginning to flesh out the sections

2019-02-17

  • Working over the skeleton

2019-02-15

  • Back to business

2019-01-24

  • Looking over skeleton of main text
  • Python issue was addressed
  • The difference was caused by the default nature of how each language did/did not interpolate missing data
  • The calculations otherwise still remained the same

2019-01-23

  • Performed a deep dive on the issues around missing data and the quantile thresholds
    • Must look at step-by-step process in Python code to determine the issue

2019-01-17

  • Checked that R and Python base results still match up after heatwaveR v0.3.6 release
    • The threshold calculations appear to be affected differently by large amounts of missing data

2018-10-30

  • More editing on the time series length vignette

2018-10-25

  • Big changes coming through
  • Added two new vignettes:
  • Assessing the effects of long-term trends
  • Assessing the effects of variance

2018-10-24

  • Finished editing the “simply shorter” section of the time series length vignette

2018-10-23

  • Beginning aggressive editing of text
  • Allowing calculation of events for all year ranges from 3 – 34
  • Not just 10 20, and 30 years
  • Removing all var results

2018-10-14

  • Incorporated ECJO’s most recent round of comments into the main two vignettes.

2018-09-14

  • Added comparison to r_vs_python.Rmd for how the two languages handle missing data to create climatologies and calculate events.
  • Completed the Ice coverage section in missing_data.Rmd

2018-09-14

  • Finished up new proposed work on time_series_duration.Rmd
  • Output word document version of time_series_duration.Rmd and missing_data.Rmd
  • Recompiled vignettes

2018-09-13

  • Finished up initially proposed work on missing_data.Rmd
  • Rebuilt site to reflect upversion to v0.0.3

2018-09-11

  • Minor additions

2018-09-10

  • Further editing to time_series_duration.Rmd

2018-09-06

  • Finished preliminary random missing data results
  • Fixed CI issues with short time series vignette

2018-09-05

  • Further editing to time_series_duration.Rmd
  • Began writing missing_data.Rmd
  • Rebuilt site to host changes

2018-09-03

  • Added AJS and ECJO feedback into MHWdetection.Rmd
  • Added AJS and ECJO feedback into time_series_duration.Rmd

2018-06-21

  • More in-depths category comparisons made

2018-06-16

  • Some pre-emptive thoughts about more category comparisons

2018-06-13

  • Finished up basic comparisons of categories for different clim periods

2018-06-12

  • Added significance tests for clims of different lengths for both single and re-sampled clims

2018-06-07

  • More work on duration section

2018-06-06

  • More work on duration section

2018-06-05

  • Smoothed out issues preventing site from being built
  • Tweaks to benchmarking of the languages

2018-06-01

  • Second section of duration vignette nearly finished

2018-05-31

  • Completed the first section of the duration vignette

2018-05-30

  • Some musings added to the short duration vignette

2018-05-29

  • Skeleton vignettes for the proposed research created

2018-05-25

  • Regenerated vignettes to reflect corrections made in heatwaveR code
  • Regenerated site to reflect fixes in site structure
  • Added LaTeX folder

2018-05-24

  • Added a NEWS.md file to track changes to the package.
  • Ported over the relevant vignettes that were cluttering up the heatwaveR site

This reproducible R Markdown analysis was created with workflowr 1.1.1